Under the direction of Bishop Robert McGuckin, extensive work was carried out on the cathedral’s foundation, where subfloor works were necessary to address building movement. These works included the installation of a root barrier along the tree line to the west and an irrigation and monitoring system to maintain soil moisture levels to prevent movement.